Page 5 - Panorama 2025
P. 5

- Opened a new branch of Tera Watt Jordan in Aqaba. (2022)

          Our Projects:

- Off-grid system for Nesr Wadi Rum Camp with a
  capacity of 215 kW. (2024)

- On-grid systems in several Jordanian governorates
  with a total capacity of 400 kW. (2025 - 2021)

- Off-grid systems with a total capacity of 120 kW.(2025 - 2021)
- Solar energy projects for mosques under the Ministry

  of Awqaf tenders with a total capacity of 75 kW. (2023)
- Net metering solar system with a capacity of 2 MW for

  Dura Municipality Hebron / State of Palestine (under

  construction). (2023)

- Off-grid solar system for the Jordanian Embassy in Nairobi,
  Kenya, with a capacity of 65 kW (under construction). (2023)

- Solar traction system with a total capacity of 20 MW
 (Phase 5 :1 MW) in Nablus / State of Palestine (under
 construction). (2022)
- Off-grid systems for the Jordanian Armed Forces with
  a capacity of 100 kW. (2019)

                                  ®
   1   2   3   4   5   6   7